About this Project

“Repairs to existing 14” water main at three locations under heavily trafficked road

Location 1: Replaced existing 14” butterfly valve with 14” geared gate valve and valve box.
Location 2: Repaired existing leak in the 14” CMLC watermain and replaced concrete lining
Location 3: Excavated to remove 30’ of existing 12” CMLC piping and replace with 14” C-900; Removed and replace existing 8” gate valve

Featured Projects

Fort Barry Balloon Hanger Stabilization

The steel structure received new epoxy protective coating, new roofing, exterior siding and electrical.

Turf Replacement at Recce Point Club

Design-Build Project, removed existing sod field while protecting the existing running track and removed 8,000 cubic yards of existing soil and sod.

Welcome Center/Community Activity Center

Renovation of existing 20,000 SF facility to provide a more modern, open and inviting atmosphere. 