Extend existing boat launch ramp by 20’ wide, 45’ long.

Included demolition and mechanical dredging

On-shore confined disposal facility for the non-hazardous dredge material.

New pre-cast boat ramp over concrete and aggregate bedding with structural steel railings

Rip Rap

A/C Paving

Featured Projects

Fort Barry Balloon Hanger Stabilization

The steel structure received new epoxy protective coating, new roofing, exterior siding and electrical.

Turf Replacement at Recce Point Club

Design-Build Project, removed existing sod field while protecting the existing running track and removed 8,000 cubic yards of existing soil and sod.

Welcome Center/Community Activity Center

Renovation of existing 20,000 SF facility to provide a more modern, open and inviting atmosphere. 

Contact Us

1003 Clegg Ct Suite A, Petaluma CA, 94954

1305 Simpson Way, Suite. L, Escondido, CA 92029

info@amadiversified.com

SBA Contact

Please send 8(a) inquires and offer letters to:
Mark McComas, SBA:
charles.mccomas@sba.gov