Fort Barry Balloon Hanger Stabilization

Golden Gate National Recreation Area, Sausalito, CA

  • Completed: April 2017
  • Project Owner: National Park Service
  • Project Type: Specialties
  • Value: $2,816,206.00

About this Project

Stabilization/renovation to the historic 10,000 SF, 60’ high balloon hanger built in 1921

Extensive removal and disposal of hazardous materials which included paint, exterior cladding and contaminated soils.

The steel structure received new epoxy protective coating, new roofing, exterior siding and electrical.

    Featured Projects

    Fort Barry Balloon Hanger Stabilization

    The steel structure received new epoxy protective coating, new roofing, exterior siding and electrical.

    Turf Replacement at Recce Point Club

    Design-Build Project, removed existing sod field while protecting the existing running track and removed 8,000 cubic yards of existing soil and sod.

    Welcome Center/Community Activity Center

    Renovation of existing 20,000 SF facility to provide a more modern, open and inviting atmosphere. 