Turf Replacement at Recce Point Club

Beale Air Force Base

  • Completed: June 2018
  • Project Owner: Department of the Air
  • Force, 9th Contracting Squadron
  • Project Type: Grading-Sitework-Civil
  • Value: $2,579,210

 

About this Project

  • Design-Build Project
  • Removed existing sod field while protecting the existing running track
  • Install subgrade drainage system
  • Removed 8,000 cubic yards of existing soil and sod.
  • Provided engineered backfill and suitable subgrade (including lime stabilization)
  • Installed synthetic turf system, with goal posts and nets, field striping including the Air Force Logo
  • New automatic irrigation system (for washing and cooling the synthetic turf)
  • Designed/installed LED sports lighting system

    Featured Projects

    Fort Barry Balloon Hanger Stabilization

    The steel structure received new epoxy protective coating, new roofing, exterior siding and electrical.

    Turf Replacement at Recce Point Club

    Design-Build Project, removed existing sod field while protecting the existing running track and removed 8,000 cubic yards of existing soil and sod.

    Welcome Center/Community Activity Center

    Renovation of existing 20,000 SF facility to provide a more modern, open and inviting atmosphere. 