Turf Replacement at Recce Point Club
Beale Air Force Base
- Completed: June 2018
- Project Owner: Department of the Air
- Force, 9th Contracting Squadron
- Project Type: Grading-Sitework-Civil
- Value: $2,579,210
About this Project
- Design-Build Project
- Removed existing sod field while protecting the existing running track
- Install subgrade drainage system
- Removed 8,000 cubic yards of existing soil and sod.
- Provided engineered backfill and suitable subgrade (including lime stabilization)
- Installed synthetic turf system, with goal posts and nets, field striping including the Air Force Logo
- New automatic irrigation system (for washing and cooling the synthetic turf)
- Designed/installed LED sports lighting system
Featured Projects
Fort Barry Balloon Hanger Stabilization
The steel structure received new epoxy protective coating, new roofing, exterior siding and electrical.
Turf Replacement at Recce Point Club
Design-Build Project, removed existing sod field while protecting the existing running track and removed 8,000 cubic yards of existing soil and sod.