About this Project

Design/Build – Remove and replace existing concrete sidewalks with interlocking concrete pavers
Demolition of existing concrete sidewalks, removals and compaction while protecting adjacent areas/structures.
Included night work and logistic scheduling so as not to disturb the occupied buildings on the base during their operations.
Replacement of approximately 65,000 square feet with new interlocking concrete pavers for both vehicular and pedestrian use with some revised path of travel areas.

    Featured Projects

    Fort Barry Balloon Hanger Stabilization

    The steel structure received new epoxy protective coating, new roofing, exterior siding and electrical.

    Turf Replacement at Recce Point Club

    Design-Build Project, removed existing sod field while protecting the existing running track and removed 8,000 cubic yards of existing soil and sod.

    Welcome Center/Community Activity Center

    Renovation of existing 20,000 SF facility to provide a more modern, open and inviting atmosphere. 

    Contact Us

    1003 Clegg Ct Suite A, Petaluma CA, 94954

    1305 Simpson Way, Suite. L, Escondido, CA 92029

    info@amadiversified.com

    SBA Contact

    Please send 8(a) inquires and offer letters to:
    Mark McComas, SBA:
    charles.mccomas@sba.gov