Storm Drain Replacement

Camp Pendleton, CA

  • Completed: October 2016
  • Project Owner: NAVFAC Southwest, Camp Pendleton Marine Corps Base
  • Project Type: Grading-Sitework-Civil
  • Value: $90,308.00

About this Project

  • Demolition included removal of existing asphalt (road), rip rap, a portion of an existing concrete swale, and existing sidewalks and curbs.
  • Installed new 18” RCP across road.
  • Provided new head walls and rip rap.
  • Replaced asphalt road and re-striped
  • Reconstructed sidewalks and curbs

Featured Projects

Fort Barry Balloon Hanger Stabilization

The steel structure received new epoxy protective coating, new roofing, exterior siding and electrical.

Turf Replacement at Recce Point Club

Design-Build Project, removed existing sod field while protecting the existing running track and removed 8,000 cubic yards of existing soil and sod.

Welcome Center/Community Activity Center

Renovation of existing 20,000 SF facility to provide a more modern, open and inviting atmosphere. 