Re-Plum Valve Configuration at Bldg. 240162

Camp Pendleton, CA

  • Completed: December 2016
  • Project Owner: NAVFAC South West, Marine Corps Base, Camp Pendleton
  • Project Type: Specialties
  • Value: $431,264.00

About this Project

Disassemble existing piping and manifolds to re-configure the system.

Included new 12” gate valves and filters

Removal and re-location of 5 existing Rotec butterfly valves and installation of 5 new Rotec butterfly valves

Installation of 50HP motors with Variable Frequency Drives, conduit and Cat (5) data and control integration and programming to integrate with the existing Allen Bradley system.

Featured Projects

Fort Barry Balloon Hanger Stabilization

The steel structure received new epoxy protective coating, new roofing, exterior siding and electrical.

Turf Replacement at Recce Point Club

Design-Build Project, removed existing sod field while protecting the existing running track and removed 8,000 cubic yards of existing soil and sod.

Welcome Center/Community Activity Center

Renovation of existing 20,000 SF facility to provide a more modern, open and inviting atmosphere. 

Contact Us

116 W College St., Suite C, Fallbrook, CA 92028

info@amadiversified.com