Re-Plum Valve Configuration at Bldg. 240162
Camp Pendleton, CA
- Completed: December 2016
- Project Owner: NAVFAC South West, Marine Corps Base, Camp Pendleton
- Project Type: Specialties
- Value: $431,264.00
About this Project
Disassemble existing piping and manifolds to re-configure the system.
Included new 12” gate valves and filters
Removal and re-location of 5 existing Rotec butterfly valves and installation of 5 new Rotec butterfly valves
Installation of 50HP motors with Variable Frequency Drives, conduit and Cat (5) data and control integration and programming to integrate with the existing Allen Bradley system.